What’s the Average Timeline for Building a Swimming Pool?

What’s the Average Timeline for Building a Swimming Pool?

Are you thinking about getting a swimming pool built in your backyard? That sounds amazing, right? Hopefully, you are thinking about sitting by the pool and enjoying summertime with your family. 

But the question is, how long will it take for you actually to live your dream, and how can you avoid things that could delay the process?

Well, there is no certain timeline for building a pool—it can vary depending on a few things, like the type of pool you want, the layout of your yard, and your desire to do it yourself or hire a swimming pool builder. Once you have answered all these queries, you’ll get a wild idea about what to expect so you can plan everything around it.

Let’s break down the process so you can get a good idea of how long your project will take!

What Are the Key Phases in Building a Swimming Pool?

When you hire a swimming pool builder, the construction process is broken down into several stages. Here’s an overview of each phase and what it involves:

1. Design and Planning

Before any digging begins, you’ll work with your builder to finalize the design of your pool. This phase is crucial and can take 2 to 4 weeks, depending on how quickly you decide and approve the plans. During this time, the builder will assess your site, check for any zoning or permit requirements, and ensure everything is in place for the construction.

Tip: The design and planning phase may take longer if your property has challenging terrain or if there are specific requests for features like waterfalls or custom shapes.

2. Permitting and Approvals

Once the design is finalized, the next step is to get the necessary permits and approvals. In most areas, building a pool requires permits from local authorities to ensure it meets safety codes and regulations. This step typically takes 2 to 4 weeks, though delays can happen if there are any paperwork issues or the permitting office is backed up.

Tip: To avoid delays, start the permitting process early, especially if you live in an area with strict regulations.

3. Excavation

Excavation is the first physical step of building a pool, where the bulk of the work starts. During this phase, the ground will be dug out to create the shape of your pool. Excavation can take about 1 to 2 weeks, depending on the size and shape of the pool and the type of soil on your property.

Tip: Weather can impact the excavation phase. Heavy rain or unexpected storms can delay the digging, so be prepared for a little flexibility in your timeline.

4. Plumbing and Electrical Installation

After digging the hole, the next step involves installing plumbing and electrical systems. This is the stage where the pool’s water circulation, heating, filtration systems, and any electrical components like lights are set up. This phase typically takes 1 to 2 weeks.

Tip: Adding extra features like spa jets, lighting, or a pool heater could extend the plumbing and electrical phase by a few more days.

5. Pool Shell Construction

The pool’s shell is built once plumbing and electrical work are in place. This is the structure that forms the actual shape of the pool. Depending on whether you’re choosing a concrete, fiberglass, or vinyl liner pool, this phase can take anywhere from 1 to 3 weeks.

Tip: Concrete pools, in particular, can take longer to cure and finish. It’s also essential to factor in drying time for plaster or gunite applications.

6. Decking and Finishing Touches

Once the pool shell is in place, it’s time to install the deck, finish the pool surface, and add any final details like coping, tile, or landscaping. This final phase usually takes about 2 to 4 weeks, depending on the complexity of your design.

Tip: This phase may take longer if you add custom features like a tanning ledge, pool house, or intricate tile work.

What Could Delay the Process?

While the average timeline for building a swimming pool can range from 8 to 12 weeks, several factors can cause delays. Here’s what might affect your schedule:

  • Weather: Rain, snow, or extreme heat can halt construction at various stages.
  • Supply Chain Issues: Materials like pool tiles, coping, and equipment may need more supply or be backordered.
  • Changes to the Design: If you decide to change the design midway through the project, it can add extra time.
  • Permit Delays: Local permitting offices may take longer than expected to approve plans, especially if your project is complex.

Final Thoughts!

In general, once you hire a swimming pool builder, expect the entire project to take 8 to 12 weeks, depending on the above-mentioned factors. If you have a set deadline, like hosting a summer pool party, plan and leave some extra time in case of delays.

By keeping these phases in mind and working closely with your builder, you can ensure the project moves smoothly and stays within your timeline. Before you know it, you’ll dive into your brand-new swimming pool, enjoying the results of all your hard work!